Keywords: i-69 i69 interstate 69 interstate69 state road 37 stateroad37 indiana road interstate freeway infrastructure i-69 development partners i69developmentpartners isolux corsán usa isoluxcorsánusa A broad perspective of the Vernal Pike construction zone in Bloomington, Monroe County, Indiana; looking north. To the left is gravel fill near the Con/Span® bridge, which is nearly at the designated level for the Vernal Pike roadbed. On the far right, visible but barely (expand the photo), is the east abutment of the overpass that will take 17th Street/Vernal Pike over State Road 37 (future Interstate 69). Between the gravel fill (left) and the mound of earth in the center (and the main reason for this photo) is a noticeable scalloped gap, which will be filled to create an even, gently sloping roadbed for Vernal Pike. I-69 Development Partners; Isolux Corsán USA, prime contractor (Indiana I-69 Corridor Project, Section 5). A broad perspective of the Vernal Pike construction zone in Bloomington, Monroe County, Indiana; looking north. To the left is gravel fill near the Con/Span® bridge, which is nearly at the designated level for the Vernal Pike roadbed. On the far right, visible but barely (expand the photo), is the east abutment of the overpass that will take 17th Street/Vernal Pike over State Road 37 (future Interstate 69). Between the gravel fill (left) and the mound of earth in the center (and the main reason for this photo) is a noticeable scalloped gap, which will be filled to create an even, gently sloping roadbed for Vernal Pike. I-69 Development Partners; Isolux Corsán USA, prime contractor (Indiana I-69 Corridor Project, Section 5). |